Back to the list
logo Théâtre de l'Odéon
 |   Contact Us
 |   Mécénat & Développement |   Newsletter   |
Facebook
Dernière minute
  • Special Event
    An Evening with Algeria. Monday, February 13th at 8pm. In memory of the 50th anniversary of the end of the Algerian War
  • Musical Reading
    Marianne Faithfull, Wednesday, February 15th at 8 pm. Shakespeare’s Sonnets. A musical reading, accompanied by Vincent Segal, cello.
  • Cities on Stages
    Six european theatres mobilize themselves,  treating the key challenges related to « the coexistence » in the big cities of the European Union. First creation : Fabrice Murgia's EXILS (Bruxelles)
Précédent Suivant
Présent composé
En février 2012, venez partager avec nous :
. une rencontre philo pour vous apprendre à "traverser les catastrophes" !
. une soirée exceptionnelle consacrée à l'Algérie,
. une découverte des philosophes amoureux : Heiddegger et Hannah Arendt par Raphaël Enthoven,
. un entretien avec Julie Wolkenstein autour de Marcel Proust.
. une lecture musicale de Shakespeare par Marianne Faithfull ...

More
 
 
picto librairie
L'Odéon en librairie
You need to install the Flash Player

The Theatre > Guided Tour

Ateliers Berthier

Enlarge text Send a link to this pagePrint this page
Envoyer à un ami : The Theatre > Guided Tour > Ateliers Berthier

 
 
 
 
A warehouse for storing stage sets, built in 1895 by Charles Garnier for the Opéra de Paris (of which he is also the architect), and used as such until the 1950's, the Salle des Ateliers Berthier, on boulevard Berthier in the 17th arrondissement, was transformed into a public building in January of 2003.
This transformation, which was supposed to be temporary (the space was intended to return to its initial functions after completion of work on the theater in the 6th arrondissement), was carried out by the architect Jean-Loup Roubert.
photo Laure Vasconi
The outside of the building, other from the glass door set in steel, the metallic awning and the red neon sign indicating the theater, has not been touched.
photo Laure Vasconi
Without losing the industrial character of the building, the reception area and ticket office have been moved into the extension that dates from the 50's, a room in the Garnier building.
The design of the reception area is simply furnished in plywood, elegantly slipped into 10 meter high concrete screens that partition off the storage space. Canopies, also made from plywood, form a series of attractive niches at the foot of the storage space. Lighting and a heating system hang from the ceiling so they can be easily dismantled.
Between the reception room/ticket office and the theater, in the openings to the stage sets, small closed spaces have been constructed.
photo Laure Vasconi
The theater auditorium is one large room, the storage space for sets and scenery having been demolished in order to free up space. Large metal beams have replaced the old, central, supporting pillars. The glass roof is covered by large panels that can be easily dismantled. The ground and the walls have been left in their original state and still bear traces from the past.
The theater's bleacher seats can also easily be dismantled, which allows for an infinite variety of configurations (stage or seating).
The dressing rooms are situated in a box at the top of the theater, the only architectural relief in the room.
In mai 2005, the Ateliers Berthier officially became the sister theater to the Odéon-Théâtre de l'Europe. New and more comfortable seating was installed. It is able to seat 395 (direct, front-stage seating).
 
 
 
|  Credits
|  Site Map
|  Newsletter